
Nigerian road projects often fail early when drainage is treated as a secondary work package. Integrated drainage design protects pavement layers, reduces flooding, improves community access and lowers maintenance cost over the asset life.
For contractors and project owners, the practical priority is to align hydraulic sizing, earthworks, culverts and outfalls before major pavement construction begins.
